Bathroom remodelingdone right behind the tile.

Anyone can set tile. We build the waterproofing underneath it the way it's supposed to be built — then finish it to a standard you'd expect from a resort, not a rental.

  • Walk-in and curbless tile showers
  • Freestanding and drop-in tubs
  • Double vanities and custom storage
  • Heated floors and luxury fixtures
  • Full membrane waterproofing
  • Accessibility and aging-in-place upgrades

Get started

Free bath design consult

Name and phone is all we need to start.

No spam. No pressure. We'll text or call within 24 hours.

Certified. Vetted. Trusted.

GAF Master Elite
Top 2% of roofing contractors in North America
CertainTeed SELECT ShingleMaster
Highest residential roofing credential CertainTeed awards
Mule-Hide Certified
Certified for commercial TPO and flat-roof systems

The build

Four weeks, no mystery.

01

Demo & rough-in

Old fixtures out, hidden water damage documented and shown to you, plumbing and electrical roughed and inspected.

02

Waterproofing

Sloped bed, bonded membrane, sealed corners. The step that decides how long your shower lasts.

03

Tile & finish

Tile set and cured on its real schedule, then vanity, glass, fixtures, paint, and trim.

04

Punch walk

You mark anything that isn't right. We fix it before we call the job complete.

Bathroom FAQ

Questions we get every week.

Most primary bath remodels run 3–4 weeks on site; guest and hall baths often finish in 2–3. Tile cure time and shower glass measurement set the floor on that schedule.
Call Now Free Quote